What are condition reports for electrical installations?

What is an EICR?

A condition report on an electrical installation (EICR) notes any flaws, degradation, and damages. It provides advice on how to enhance any area of a home and points out any potential warning indicators. It demonstrates safety and adherence to the most recent rules. The earth bonding, wiring, fuse board, earth system, and any other relevant hidden components are also checked in this report. As a legitimate EICR, the Landlord’s Electrical Safety Certificate is also recognized.

Read More: electrical installation condition report

If your home is privately held, it is advised that you perform an electrical check every 10 years as a homeowner. In the case of rentals, the landlord faces a punishment of up to £30,000 if an EICR finds that the rental property does not comply with the rules and strict safety requirements.

How does a condition report for an electrical installation operate?

The number of switches on a contemporary fuse board is necessary to determine the number of circuits on a property. The somewhat bigger switches are called RCDs, and each little switch, also known as a circuit breaker, symbolizes one circuit.

An EICR does not cover portable appliances. In order to verify that they are safe, appropriate, and utilized for the specified purposes, a PAT test would need to be performed.

FAQs for ECIR

Does my EICR need to be completed?

Landlords, both residential and commercial, are now required by law to have an installation examined and tested at least once every five years or if an occupancy shift occurs.

How much time is ideal for an EICR?

Although every house is unique, the electrician must inspect every inch, so you should anticipate that they will be there for a considerable amount of time. It can take up to an hour for a visual examination alone, and an additional hour for the certificate’s completion.

How often ought an EICR to be completed?

While it is currently required for landlords to have an installation examined and tested at least once every five years, and more frequently if the most recent safety report specifies it, it is advised that private properties have an EICR every ten years.

How can I get ready for an EICR?

Be advised that prior to working on the wiring, your electrician will need to shut off the electricity. Since you won’t have access to any electronics, it might not be the greatest day for working from home. Getting them in and letting them get on with it for a few hours would be simpler. After circuits have been tested, they can be re-tested, although this will slow down the procedure.

Make sure all light outlets, switches, and lights are free for your electrician to reach. This entails organizing workspaces (such kid’s bedrooms, lofts, and workplaces) in advance of their arrival.

You shouldn’t anticipate receiving a price for corrective work from your electrician right away. Before they can accomplish this, the data from the check itself must be processed, which will take around 48 hours. It may take longer, especially if you need major repair work and the electrician needs to visit you again to discuss your alternatives before providing an estimate.

Anticipate that the report may reveal a few “failures” in your wiring setup. Your lights don’t necessarily indicate that the underlying system is secure just because they turn on.

Keep in mind that the issues found during the initial inspection are probably the most costly. After significant errors are fixed, there should be fewer issues to detect on future inspections.

When doing an EICR, what actions do the engineers take?

The electrician will examine your electrical systems visually and then perform a number of system inspections. Any “code one” issues, or those that pose an urgent risk, must be resolved right away or at the very least rendered safe. At the conclusion of the process, a price for a remedy will be given for any “code two” issues that may be harmful. Issues that are not considered dangerous, or “code threes,” will once more be recorded and cited for.

During the visit, the electrician will finish a seven-page report. We at Manchester eicr will provide you a copy of this report together with an estimate for any additional repairs that are suggested to bring your system up to code. The paperwork processing procedure may take a few days.

When doing an EICR, what is examined?

The electrician will verify that your fuse board complies with the most recent rules and is safe. This refers to whether or not it has the required RCD protection and circuit breakers. In order to avoid lethal electric shocks, other precautions include making sure that everything is properly earthed. Your plumber will examine the plumbing for your gas meter, water heater, radiators, and every metal component in the structure. They will also make sure that the wiring is installed correctly by inspecting your sockets, lights, switches, and accessories. An EICR does not cover portable appliances. This calls for an additional test.

Some businesses will simply test a sample (10%) of your electrics; Manchester eicr will test 85–100% of them.

Who is capable of doing an EICR?

You can verify on the Electrical Safety Register whether an electrician is approved by another electrical regulating authority at a comparable or higher level, or if they are NICEIC accredited at the approved contractor level.